Abstract

Wafer fabrication is the most complex phase in the semiconductor manufacturing process. Semiconductor wafer fabrication facilities (wafer fabs) contain re-entrant product flow through machines operating in parallel. Some of these machines incur sequence-dependent set-ups, while others are capable of processing multiple jobs in batches. This complex job shop can be modelled as a disjunctive graph, and then scheduled using a modified Shifting Bottleneck heuristic. The existence of the batch-processing machines in the complex job shop creates the potential for cyclic schedules to be produced by the modified Shifting Bottleneck approach, primarily due to the existence of dummy batching nodes and delayed precedence constraints. We propose a cycle elimination procedure to assist in maintaining schedule feasibility during the modified Shifting Bottleneck procedure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.