Abstract

This paper presents a heuristic algorithm to schedule a hot rolling mill in the aluminum industry. One problematic issue is the tight coupling between the homogenizing furnaces and the mill, which needs to be integrated into the heuristic design. The latter also takes into account standard technological constraints like alloy hardness transitions, roll wear, homogenization code compatibilities and width transitions. The objective is to minimize the idle time on the mill and penalties for soft constraint violations related to production quality. The heuristic is divided into two phases. First, batches of ingots are constructed for the furnaces. These batches, called blocks, are then sequenced on the mill. Numerical results are reported on test instances derived from real-world data.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.