Abstract
In the last few years hydroelectric power stations with tubular units have become more significant. For a prefeasibility study, the civil engineer therefore needs a quick method to determine the approximate size of the runner diameter. In this paper the data of constructed and planned bulb units are evaluated. The necessary equations are given with regard to the metric and British unit system. As a result a new design chart is introduced and the application is explained by a numerical example.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.