Abstract
Analytical rules for selecting orders from the precedence by using heuristic scheduling algorithms in MES and APS class systems are considered. The proposed sampling rules are presented for single-stage and multistage planning systems, subjected to the intensity of orders. Keywords heuristic scheduling algorithm, order intensity coefficient, one-stage systems, multi-stage systems, slack time, directive due dates
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.