Abstract
Indian summer monsoon of 2015 was deficient with prominence of short-lived (long-lived) active (break) spells. The real-time extended range forecasts disseminated by Indian Institute of Tropical Meteorology using an indigenous ensemble prediction system (EPS) based on National Center for Environmental Predictions’s climate forecast system could broadly predict these intraseasonal fluctuations at shorter time leads (i.e. up to 10 days), but failed to predict at longer leads (15–20 days). Considering the multi-scale nature of Indian Summer Monsoon system, this particular study aims to examine the inability of the EPS in predicting the active/break episodes at longer leads from the perspective of non-linear scale interaction between the synoptic, intraseasonal and seasonal scale. It is found that the 2015 monsoon season was dominated by synoptic scale disturbances that can hinder the prediction on extended range. Further, the interaction between synoptic scale disturbances and low frequency mode was prominent during the season, which might have contributed to the reduced prediction skill at longer leads.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.