Abstract

Minimizing the cost of capital tied up by inventory is frequently an important management objective of production scheduling. The paper determines the optimal production schedule of a single machine sequencing problem for two cases; first when the cost of capital is calculated by periodic interest calculation, and second, when the cost of capital is determined by continuously compounded interest calculation. The results are derived for common due date and for different due dates situations as well. The robustness of the suggested production schedules to the method of interest calculation is proved theoretically and demonstrated with the example of a calendar manufacturer.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.