Abstract

This study aimed to present the robustness evaluation of job-shop scheduling based on Theory of Constraints (TOC) concept under processing time and demand variations using simulation technique. The performance of schedule based on TOC and traditional method (minimizing Cmax) were compared in terms of schedule robustness and performance. Simulation test scenarios were carried out by applying different distributions of processing time with two case problems as single and double bottlenecks cases. In addition, demand variation was added to the simulation test at the last experiment to increase the system variation. The results showed that the schedule based on TOC concept was superior to the schedule from traditional method when the variation in both processing time and demand were increased and the production system was more complicated as can be observed from the results of double bottlenecks case.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.