During construction, change orders often occur. Change orders that occurred in 10 road construction projects in the DKI Jakarta province were calculated by the job change index. The biggest job change index was in structural work (88.768%), and the average index of additional work changes in asphalt pavement was 77.28%. Producing the largest added job change index in drainage work (26.31%) and less job change index of 87.6% in road performance maintenance work. Also produces the largest average change in return on minor conditions of 107.35%. The technical reasons for the change order in these 10 projects are: Spec and design change group, scope change group, disruption of the project operations group, contract document discrepancies group, incompetent consultant group, document delays group, and client financial changes, and the last is the lack of coordination with the authorities. Initiators causing change orders are contractors, owners, other parties, and consultants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.