Abstract

This paper explores the risk associated with contract growth and opportunistic behavior in contractors with a special focus on the management of changes and interfaces. The study compares two successful megaprojects, the Gudrun oil platform by Statoil in the North Sea and the ATLAS detector at CERN. The empirical data were obtained using in-depth interviews with key personnel at Statoil and CERN. The study makes three significant contributions to knowledge: (1) megaprojects can benefit from having a high level of staffing since management costs are relatively small compared to construction costs; (2) when part of the end design is left to contractors, the contractors are given an opening to act in an opportunistic manner, which can cause contract growth; and (3) when a high level of integration is performed in-house, companies can take an extreme cost-driven approach to contracting.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.