Abstract

South Africa's largest electricity producer has embarked on mega investments to build new power stations. This paper reports on the risk management maturity level, and risk management processes. The research adopted the survey research method and self-administrated questions to collect primary data. The investigation targeted the total population of 100 engineers, technical managers, safety officers and quality officers. The researchers collected a total of 44 useful responses. The research established that the overall risk management maturity at the intermediate level. The risk response planning and risk monitoring were identified as processes that need improvement. The risk factors in the South African power utility construction projects were a lack of pre-planning, the level of contractor's performance, community unrest, labour unrest, safety incidents, defective work and poor risk management skills. The paper has both theoretical and practical implications despite the limitations associated with the study design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.