Abstract

AbstractUsual scheduling rules are not always appropriate in a Kanban assembly job-shop. We present five new heuristic rules that use an analysis of assembly network diagram topology to schedule waiting jobs. The production of a sample of the products of a firm is simulated under different operation conditions. MCDM techniques allow comparison of rules for the optimisation of makespan, stock level, and setups.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.