Abstract

During the 14th Five-Year Plan period, Hubei Power Grid will inevitably face the changes and challenges that are brought by power system transformation. This paper introduces basic situation of Hubei Power Grid during the 13th Five-Year Plan period, such as social economy, power grid structure, installed power capacity, total electricity consumption and load, electricity demand, power grid equipment and line loss rate, analyzes critical influencing factors during the 14th Five-Year Plan period, and puts forward the trend of line loss rate of Hubei Power Grid during the 14th Five-Year Plan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.