Abstract
The compatibility of AC propulsion systems with coded train detection and onboard speed code reception systems is always a concern. A review of an automatic train control system commissioned for the Greater Cairo Metro System is presented. The compatibility of track-to-train transmission with the inverter-controlled AC drive and the 750 V DC third-rail power supply is also examined.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.