Abstract

<p><strong>The problem of delays in the construction industry is a national phenomenon and Jakarta is no exception. The main purpose of this study is to identify the factors of project delays and their effects on cost overruns for building projects in Jakarta. ) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) subcontractors. Then an analytical survey was conducted which was distributed to 26 respondents. The ten delay factors were analyzed to determine their effect on project cost overruns. From the results of the analysis it can be seen that: (1) office overhead (2) contractor experience, (3) work methods (4) material delays, (5) tool mobilization (6) precast material fabrication (7) work quality (8) worker quality (9) field cashflow (10) Subcontractors have their respective weights of influence on project cost overruns</strong></p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.