Abstract

The electric power network reconfiguration of warship integrated power system is one of the most important methods to restore power supply and improve survivability of shipboards under fault. The reconfiguration method based on graph trace analysis (GTA) and generic algorithms is proposed for warship integrated power system in order to maximize the number of served loads with highest priority under fault. Simulation results have demonstrated that is method is able to reach target configurations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.