Abstract

Some offshore oilfields of Vietnam such as Bach Ho, Rong, Dai Hung, Ruby,… are at this moment in the secondary recovery stage. Gas lift production is one of the suitable methods in this period. Gas lift has proved itself as a more advantageous method in comparisons with other mechanical methods applied at Ruby oilfield. On the Pearl wellhead platform located in Ruby field, a gas lift system is installed to serve for the extraction of petroleum. The system is provided with compressed gas supplied from the FPSO Ruby II through a subsea 6 inches pipeline gas lift. For the sake of effective producing activity, it is a vital task to ensure the safety of this pipeline system during operations. In the case of failures, reparation should be applied immediately to minimize shutdown time and reduce the cost of troubleshooting. This article presents the “smart flange” technique to repair the gas lift pipeline system from the FPSO Ruby - II to the Pearl wellhead platform. Results of the work provide realistic knowledge to propose practical solutions to the maintenance and reparation of this system and thus, improve its operation.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.