Abstract
The development of the cruise industry is an important part of the country’s “Marine power” and “One Belt, One Road” strategy. Improving the independent construction of cruise ships is of great significance to my country’s economic and social development. Aiming at the problem of the assembly order of cruise ship outfitting parts are many, the quantity is large, and the interchangeability of materials is higher than that of conventional ships, a cruise ship outfitting on-board assembly scheduling problem model is constructed, and a cruise ship outfitting on-board assembly material scheduling method oriented to generally outfitting is proposed. The improved genetic algorithm is used to dispatch the materials on the outfitting ships to realize the optimal utilization of the materials and materials, and the effectiveness of the method is proved by the example verification.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.