Abstract

At present, the world is vigorously promoting the innovative development concept of “green development, park first,” prompting the park to vigorously promote the construction of electric vehicle charging stations and charging pile projects. However, the development of the construction is not satisfactory due to a series of restrictive factors. Under this background, this article studies the constraints of EV charging stations in the park and further studies the impact on park planning. First, this article outlines the constraints of charging piles in the park based on the field research. Then, interpretive structural modeling (ISM) is adopted in this article for in-depth analysis of the restrictive factors. Finally, the impact on the industrial park’s planning is analyzed as a case study. The improved countermeasures provide a basis for the scientific planning and design of electric vehicle charging stations in industrial parks.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.