Abstract
Since power-frequency overvoltages can influence the safe operation of the submarine cable transmission system greatly, it is indispensable to calculate the overvoltages that may occur during actual situations. In this study, the power-frequency overvoltages of the offshore oil-gas field group’s submarine cable transmission system are calculated through PSCAD/EMTDC. Among the different conditions considered, the maximum power-frequency overvoltage is 1.134p.u., which occurs in the case of single-phase fault earthing at the cable joint in L4. The result fulfills the limit of relevant regulations for the 220 kV transmission system, indicating that the submarine cable transmission system can operate safely and effectively, which can provide important guiding significance for the construction and operation of the system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.