Abstract
With the development of railway technology, the Train control system of Beijing-Zhangjiakou high-speed railway, which was opened in 2019, applies CTCS-3+ATO (Automatic Train Operation) technology to realize automatic driving at 350km/h, including automatic train opening, automatic and precise parking, and the linkage between train doors and platform doors. To ensure the safety and reliability of train control system, it is necessary to test the system. In this paper, the test cases used in the testing work are concatenated into test sub-sequences according to certain principles, and the concatenation problems of test sub-sequences are converted into TSP (Travelling Salesman Problem) for solving. PSO (Particle Swarm Optimization) algorithm was used to obtain the test sequence of ATO system in high-speed railway, which provided guidance for the test work.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.