Abstract

Hong-shui river especially big bridge is a kind of semi hybrid steel-concrete comoposite cable-stayed bridge. The erection of Guizhou side span adopt the incremental launching construction method, which was composite beam; The erection of midspan adopt cable-stayed buckled method, which was composite beam; The erection of Guangxi side span adopt support frame casting in situ construction method, which was concrete π type girder. The paper focus on the characteristics of the asymmetrical structure forma and asymmetric construction method of Hong-shui river especially big bridge, discussing the key contents of construction monitoring, which can offer reference and consulting for related engineering.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.