Abstract

This paper introduces the order and operation performance of 600 MW supercritical W-flame boiler in China and Vietnam. The investigation and survey results about 600 mw supercritical W-flame boiler water wall cracking are indicated. The reason of water wall cracking is analyzed according to the boiler operation and the main reason is the furnace thermal deviation in horizontal direction. The paper indicated the performance and some measures to prevent the water wall cracking from design, installation and commissioning & operation in Vinh Tan 1 Power Company Limited. The fully mixing header is provided on the transitional section of the water wall, which is the most useful method to prevent the water wall cracking.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.