Abstract

The article discusses issues related to the study of heat generation of cements used in the construction of a bridge across the Kerch Strait. This problem seems to be important because of the construction of the mentioned object in conditions of a dry hot climate. The study was conducted with the use of modern information and analytical systems in real time, allowing obtaining results close to real conditions. On the basis of comparative analysis of the calculation and practical measurement of heat the main conclusions of the work were done, recommendations on the use of cements of various types in the construction of the bridge Kerch and other similar extra-curricular facilities that are included in the basis of the developed technological regulations for the production of preparatory, reinforcement, formwork and concrete works in circumstance of year-round construction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.