Abstract
The extended-reach horizontally-intersected well used to extract coalbed methane (CBM)can increase reservoir contact area, extend the influence scope of drainage-pressure drop and the district of CBM desorption. Furthermore, the extended-reach horizontally-intersected well can enhance unit well output and create favorable conditions for future workover. With the support of Major Projects of National Science and Technology, the research on key technologies of extended-reach horizontally-intersected well is done through theoretical analysis and experiment, the concrete research content includes selection of target formation and design of casing program, choice of survey instruments, research on the bottom hole assembly design and technique of steering wellpath, research on drilling fluid and extended-reach horizontally-intersected technology. As engineering examples of popularization and application of extended-reach horizontally-intersected well, a “U” shape well group located in Sihe mine field of Qinshui Basin and a “V” shape cluster well group located in Dafosi coal mine of Binchang mining area have been constructed successfully by using the integrated technologies.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.