Abstract

The design of preloading involves loading schedule design and prediction of post-construction settlement. As the in situ measurement data are usually unavailable during the loading schedule design, it is difficult to estimate the preloading effects before construction. In this Reply, we first discuss the satisfied conditions of eq. (D4) in the Discussion (Mesri andWang 2015) based on Bjerrum’s creep diagram (Bjerrum 1967) and Yin–Graham’smodel (Yin and Graham 1989). Then the research objective and significance of the paper under discussion (Hu et al. 2014) are addressed. Based on Bjerrum’s creep diagram and Yin–Graham’s model, the void ratio at the end of service period for soft soil can be expressed as (Hu 2012)

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.