The Last Planner System (LPS) has been used on construction projects to improve reliable work planning. Lookahead planning is an intermediate process that connects the master or phase schedule to the weekly work plan. Construction teams employ lookahead planning to achieve various objectives including a breakdown down of activities into the level of operations, operations design, and constraint removal to make tasks ready for execution. Tasks Made Ready (TMR) measures the performance of lookahead planning in identifying and eliminating constraints to make activities ready for implementation. The purpose of this paper is to study through computer simulation the impact of TMR on task execution, reliability of weekly work planning, and project duration. Results show that TMR is a good predictor of project duration. These results advise planners on the importance of the constraint removal process, how it influences the reliability of construction planning, and its impact on project duration.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.