Abstract

In this study, the US–ZVI system was used to produce the strong reductants including H and nascent Fe2+ ions to eliminate the toxicity of the high concentration p-nitrophenol (PNP) wastewater. The effect of the reactor structure, initial pH, ZVI dosage, ultrasonic power and initial PNP concentration on the removal efficiency of PNP from water was investigated intensively. The results show that a higher removal rate can be obtained by using a conical structure reactor, and the lower initial pH can aid the acceleration of PNP removal rate by using US–ZVI system. Furthermore, the removal efficiencies of PNP increased obviously with the increase of initial ZVI concentration from 0 to 15gL−1. Also, the treatment capacity of ZVI was enhanced remarkably by the ultrasonic irradiation, and the US–ZVI system can maintain high treatment efficiency for the high concentration PNP wastewater (500–10,000mgL−1). Meanwhile, the high removal efficiency of PNP was mainly resulted from the synergistic reaction of ZVI and US. At last, the main degradation product (i.e., p-aminophenol) was detected by gas chromatography–mass spectrum (GC–MS). Thus, the reaction pathway of PNP in the US–ZVI system is proposed as a reducing process by the H and nascent Fe2+ ions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.