Abstract
This paper describes the reliability tests performed when manufacturing the 500 kV GIS. It contains the results of measuring tests for induced surge to the GIS low-voltage control circuit and measuring tests for induced current to the GIS external grounding structure. The paper proposes the methods for suppressing the induced surge and for setting the induced current circuit.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.