Abstract

This study presents an integrated approach for reliability planning and risk estimation in active distribution systems. By incorporating the use of accurate reliability equivalents for different medium voltage/low voltage networks and load subsectors, a probabilistic methodology is proposed to capture both power quality and reliability aspects in power system planning, which potentially avoids the underestimation of system's performance at bulk supply points. A ‘time to restore supply’ concept, based on security of supply legislation, is introduced to quantify the effect of different network functionalities such as the use of backup supply or automatic/manual reconfiguration schemes. The range of annual reliability indices reported by 14 network operators in the UK is also used for the validation of reliability results, which allows estimating the risk of interruption times above the regulator-imposed limits. Accordingly, conventional reliability assessment procedures are extended in this study by analysing a meshed urban distribution network through the application of a time-sequential Monte Carlo simulation. The proposed methodology also acknowledges the use of time-varying fault probabilities and empirical load profiles for a more realistic estimation of customer interruptions. A decision-making approach is shown by assessing the impact of several network actions on the accuracy of reliability performance results.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.