Abstract

Protective systems have two contradictory failures: one is failed-dangerous and the other is failed-safe. Scheduled maintenance is carried out to prevent these failures. Unscheduled maintenance is also carried out when the protective system shuts down the plant to be protected. This paper develops an integral equation for a statistically expected cumulative loss which is caused by the failures of the protective system and the plant. This equation represents special cases number of normal and spurious shutdowns, and hazards. An optimal scheduled maintenance interval is obtained, minimizing the expected loss.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.