Abstract
In this article, according to the reliability appraisal of the structure of a heavy industrial plant which is near service limit years, we found several major safety hazard issues and proposed corrective measures to reinforce. On the basis of structural calculation and analysis, we could determine whether to upgrade the crane and propose the corresponding feasibility upgrade project, which can provide the basis for other similar identification.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.