Abstract

In this paper, we examine the impact of scheduling policies on batch sizing decisions in a multiproduct manufacturing system. We also investigate the joint effect of scheduling policies and batch sizing decisions on manufacturing lead times. In particular we compare the performance of a first come-first-served (FCFS) policy with a group scheduling (GS) policy and study the effect of both on the optimal batch size.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.