Abstract

<p>Material waste has been considered as a major problem in the construction industry. Material waste not only has a negative impact on the success and efficiency of construction project, but also on construction cost, construction time, productivity and sustainability aspects. This paper aims to identify the major causative factors of material waste in China construction sites, their preventive measures and the relations between them. For this purpose, views of Chinese construction industry practitioners in Chongqing city were gathered by a questionnaire survey. The respondents were requested to rate a total of 34 causative factors of material waste and 9 preventive measures, which were gathered from previous literature. These causative factors were grouped into eight categories: Design, Handling, Procurement, Operation, Worker, Management, Site condition and External factors. The major causative factors of each category and preventive measures of waste were determined. Based on the identification of major factors and measures, the relations between them were also determined.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.