Abstract

Distribution system operators (DSOs) are facing new challenges when more distributed generation (DG) is connected to the network. In this new operating environment the DSO has to be able to plan an efficient network topology, which consists of reinforcement and extensions. In addition, the DSO has to finance the investment from tariffs. The methods to solve network planning problems are reviewed in this paper. The studied network planning problem is the case when the DSO has no influence on the location of DG due to the unbundling between DSOs and production. Furthermore, the regulation for how the DSOs are allowed to design the tariffs in systems with DG vary between countries, a comparison of how the DSOs design their tariffs under different regulations is presented. This paper ends with a case study on methods that Swedish DSOs use to plan the networks when considering the uncertainties caused by wind power and the regulation impact on distribution network planning and network tariffs in Sweden.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.