Abstract
CV Oto Boga Jaya (Oto Bento) is one of the largest industries which is producing Japanese food that is located in Bogor City and has many franchise partners throughout Indonesia. CV Oto Boga Jaya has the most significant problem and complained by most employees and operators (interview results) is a matter of factory layout between the raw material warehouse and the production area where the position of the two departments has an excess of more than 29 meters and takes time more than 10 minutes for one move. Therefore, researcher conducted observations and data processing with systematic layout planning (SLP) methods to design a new factory layout for CV Oto Boga Jaya. The processed data is the Operation Product Chart (OPC) data by selecting the product that has the highest and longest production process named shrimp roll, routing sheet, material handling costs, and initial layout as a reference. Then after conducting the research, the results obtained are in the form of 2 alternative layouts with distances and positions of different departments that have been processed in the FTC, ARC, ARD, AAD. The results of this study were chosen alternative layout 2, because it has shorter inter-departmental distances, a more orderly production / administration process, and fewer room intersections compared to alternative layout 1.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.