Abstract

Based on guaranteed allocation and the purpose of protecting casing of oil and water wells. According to the characteristics of horizontal well water injection, the horizontal well water injection is divided into three sections from the well head to the ground. According to the flow characteristics of each segment, the relation between the yield and the differential pressure sections were established. Finally, according to the principle of node analysis, the calculation method of injection pressure is obtained. According to the theoretical formula, a computer model for the calculation of the pressure in the horizontal well section is worked out, which is convenient and quick to calculate the reasonable water injection pressure of the wellhead.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.