Abstract

Consider the following scheduling problem. We are given a set of jobs, each having a release time, a due date, a processing time, and demand for machine capacity. The goal is to schedule all jobs non-preemptively in their release-time deadline windows on machines that can process multiple jobs simultaneously, subject to machine capacity constraints, with the objective to minimize the total busy time of the machines. Our problem naturally arises in power-aware scheduling, optical network design, and customer service systems, among others. The problem is APX-hard by a simple reduction from the subset sum problem. A main result of this paper is a 5-approximation algorithm for general instances. While the algorithm is simple, its analysis involves a non-trivial charging scheme which bounds the total busy time in terms of work and span lower bounds on the optimum. This improves and extends the results of Flammini et al. (Theor Comput Sci 411(40–42):3553–3562, 2010). We extend this approximation to the case of moldable jobs, where the algorithm also needs to choose, for each job, one of several processing-time versus demand configurations. Better bounds and exact algorithms are derived for several special cases, including proper interval graphs, intervals forming a clique and laminar families of intervals.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.