Abstract
Carbon nanotubes (CNTs) have shown potential as a good candidate for performing strain and damage sensing in composites, however, the number of studies that have examined CNTs piezoresistive response under impact is limited. This paper investigates a novel technique for real-time damage sensing during and after impact strikes on composite laminates. In this technique, aligned CNT sheets layers are distributed through the thickness to monitor the developing damage in the host structure's impact side, mid-plane and non-impact side. This is accomplished through measuring the CNT sheets' in-plane electrical resistance changes simultaneously and linking them to the impact damage modes in the structure. The experimental results demonstrate the CNT layers' ability to detect, locate and quantify impact damage when the host structure undergoes different types of impacts. The results highlight the CNT sensing layers high sensitivity to damage accumulation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.