Abstract

In this paper, we develop strategies for the problem of space station on-orbit activity re-planning. Considering the effects of emergencies, a preprocessed strategy is firstly proposed to reconstruct conflicting missions. Furthermore, a greedy algorithm with interval-based strategies is used to re-plan the activities of the reconstructed missions by utilizing mission priority and preplanned activity schedule intervals. Taking into account the propagation of complicated constraints, a time backtrack iteration strategy is adopted to solve constraint conflicts. We demonstrate the proposed approach with a notional operation scenario of the Chinese future space station. The results indicate that our method can successfully re-plan space station on-orbit activities when emergencies occur, all constraint conflicts can be solved, and mission accomplishment rate is increased, in comparison with a method that does not include re-planning strategies.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.