Abstract

This article provides new insights into the project life cycle by proposing an alternative image to the predefined time boundary between life cycle stages. It makes a theoretical contribution by identifying how project organizations re-create patterns of action—organizational routines—as they transition through life cycle stages. It presents the findings of an autoethnographic empirical study and, through the lens of routine dynamics, contributes to the project management literature by identifying a five-stage process model of transitioning and the generative mechanisms involved in re-creating patterns of action.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.