Abstract

Performance of a resistive superconducting fault current limiter (SFCL) component is usually limited by temperature rise associated with energy input by fault current application during a fault. Therefore, it is expected that short application of the fault current may enhance the power ratings of the component. This can be accomplished by a combination of a HTS component and a mechanical switch. The fast switch (FS) developed recently enables the fault duration to be as short as 1/2 cycle after a fault. Various second-generation (2G) high temperature superconductors (HTS) and YBCO thin films have been tested. The relation between the rated voltage V and the fault duration time t was found to be V2∼t−1. Based upon the relation, we predict that when the FS break the fault current within 1/2 cycle after a fault, the amount of HTS components required to build an SFCL can be reduced by as much as about 60%, of that when breaking the fault current at three cycles.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.