Abstract

As the expansion of fibre optic systems continues and the amount of installed single and multiway ruggedised fibre cable increases there has been a growing interest in IN-SITU fibre cable repair systems. Until recently, fibre cable repairs have been centred around conventional techniques (1, 2 & 3) i.e. termination and fusion splicing. The repair conditions dictated by these techniques requires the utilisation of the following facilities and materials:- 1. Epoxy resin systems and their applicators. 2. Good polishing facilities. 3. Passive hand held tools: e.g. cable strippers, wire cutters, fibre cleaver etc. 4. Active tools (electrically powered); e.g. Arc fusion splicer, heat gun, heat curing fixtures etc. 5. Connectors for terminated fibres. 6. Completed internal and external splice protection (for fusion splicing). 7. Visual inspection (microscopes).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.