Abstract

In this paper, a new mechanism is proposed to apportion expected reserve costs between electricity market agents in the power system. The uncertainties of generation units, transmission lines, wind power generation and electrical loads are considered in this model. Hence, a Stochastic Unit Commitment (SUC) is used to apply the uncertainty of stochastic variables in the simultaneous energy and reserve market-clearing problem. Moreover, electrical customers can participate in the electricity market based on their desired strategies. In this paper, a novel method is proposed to allocate reserve costs between GenCos, TransCos, electrical customers and wind farm owners. Consequently, market agents are responsible for paying a portion of the allocated expected reserve costs based on the economic metrics that are defined for the first time in this paper. Finally, two cases including a 3-bus test system and IEEE-RTS are utilized to illustrate the performance of the proposed mechanism to share the expected reserve costs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.