Abstract
The effects of using different clad materials on the uncontrolled reactivity insertion transients of a material test research reactor were studied. For this purpose, the aluminium clad of an MTR was replaced separately with stainless steel-316 and zircaloy–4. Simulations were carried out to determine the reactor performance under reactivity insertion transients with totally failed control rods. Ramp reactivities of 0.25$/0.5 s and 1.35$/0.5 s were inserted with reactor operating at full power level of 10 MW. Nuclear reactor analysis code PARET was employed to carry out these calculations. It was observed that when reactivity insertion was 0.25$/0.5 s, all the reactors stabilised at new power levels. The SS cladded fuel attained the minimum power level of 17.72 MW, followed by Zr-4 cladded with 23.62 MW while it was maximum at 24.31 MW for Al cladded fuel. When reactivity insertion was 1.35$/0.5 s, the feedback reactivities were unable to control the reactor which resulted in the bulk boiling of the coolant; the Al cladded was the first to reach ONB while SS cladded was the last.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.