Abstract
PurposeThis study is dedicated to systematically collating the distribution and utilization circumstances of geothermal resources in China. Moreover, it endeavors to formulate a comprehensive utilization scheme for geothermal resources during the construction and operation phases of the railway, thereby furnishing robust support and valuable reference for the holistic utilization of geothermal resources along the railway corridor.Design/methodology/approachThrough an in-depth analysis of the extant utilization of geothermal resources in China, it is discerned that the current utilization modalities are relatively rudimentary, bereft of rational planning and characterized by a low utilization rate. Concurrently, by integrating the practical requisites of railway construction and operation and conducting theoretical dissections, a comprehensive utilization plan for the construction and operation periods of railway is proffered.FindingsIn light of the railway’s construction and operation characteristics, geothermal utilization models are categorized. During construction, comprehensive modalities include tunnel illumination power generation, construction area heating, tunnel antifreeze using shallow geothermal energy, tunnel pavement antifreeze and construction concrete maintenance. During operation, they comprise operation tunnel antifreeze, railway roadbed antifreeze, railway switch snow melting and deicing, geothermal power station establishment and railway hot spring health tourism planning.Originality/valueAccording to the characteristics and actual needs of railway construction and operation, it is of great significance to rationally utilize geothermal resources to promote the construction and operation of green railways.
Published Version
Join us for a 30 min session where you can share your feedback and ask us any queries you have