Abstract

Banda Aceh experiences flood-related problems yearly, specifically during peak rains, which inundates several residential areas and municipal protocol roads. One of the most effective ways of resolving this problem is by constructing drainage channels in settlements. However, there are various problems associated with using this process in the survey, planning, and construction stages. During the development process, numerous obstacles are experienced from various factors, thereby leading to less optimal planning and implementation process. Therefore, this research aims to determine the dominant factors influencing drainage construction in residential areas in Banda Aceh City, Indonesia. This is a quantitative research with data collected through a questionnaire from 200 respondents involved in constructing residential area drainage in Banda Aceh City from 2017 to 2020. The factors evaluated were pre-planning, planning, and implementation, which were analyzed using Principal Component Analysis (PCA). The results showed that the factors influencing the drainage construction of residential areas in Banda Aceh City consist of implementation barriers, implementation discrepancies, pre-planning, planning, land acquisition, and community involvement with a total variance of 70.449%, while the dominating factor has a variance of 31.030%.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.