Abstract

Abstract This paper describes a field project currently in progress in Corpoven's Anaco District, Eastern Venezuela. Corpoven S.A. an operating affiliate of Petroleos de Venezuela (PDVSA) has experienced production difficulties with paraffin deposition in natural flow and gas lift wells. A series of field tests were therefore devised to evaluate specialized plunger lift applications in problem wells. The objective of these tests was to investigate lifting techniques that would minimize existing paraffin removal costs involving wire line mechanical scraping of depositions in the production tubing and hot diesel fuel injection for solidified wax removal. During 24 months of continuous field testing, results indicated the possibility to keep affected wells on production using a plunger lift piston to dynamically remove precipitated wax in a relatively short cycle operation. Usefull production life between workovers has been dramatically increased while operating costs were correspondingly reduced. Response has been very positive in wells where various field options involving plunger lift technology have been completed. The method will have been extended to 17 additional wells by the end of 1990. Preliminary results to date indicate a similar success rate to that of the previous tests.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.