Abstract

The renovating of a new water treatment plant in Paris which produces 15% of the capital's drinking water supply is described: an original treatment plant consisting of a preozonation, a flotation with a low level of coagulant coupled with contact coagulation. Coagulation on filter has been tested on a pilot plant. The results are excellent (95 to 99%) and have led to the building of a new water treatment plant with very flexible operating conditions depending on the quality of the water.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.