Abstract

This paper presents a simulation study of the system efficiency, in terms of production rate, of automatic transfer lines. A particular type of system, referred to as balanced automatic transfer lines, is considered in the study. In such a balanced automatic transfer line, the stations are considered identical in terms of availability and the buffers are uniformly allocated, and only four system design parameters are involved, namely the number of stations, the identical failure and repair rates, and the uniform buffer capacity. Based upon simulation results, an empirical production rate equation is established by using available optimization techniques for fitting non-linear functions. The empirical relationship is validated using further experimental results. It is shown that this empirical equation can be simply used, with a high enough accuracy in many practical applications, to predict production rates of balanced automatic transfer lines with reasonably wide ranges of system design parameters.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.