Abstract

This paper describes practical optimization/ approximation algorithms for scheduling a set of partially ordered computational tasks onto a multiprocessor system so that the schedule length will be minimized. Since this problem belongs to the class of ''strong'' NP-hard problems, we must foreclose the possibility of constructing not only pseudopolynomial time optimization algorithms but also fully polynomial time approximation schemes unless P = NP. This paper proposes a heuristic algorithm named CP/MISF (critical path/most immediate successors first) and an optimization/approximation algorithm named DF/IHS (d thfirst/implicit heuristic search). DF/IHS is an excellent scheduling method which can reduce markedly space complexity and average computation time by combining the branch-and-bound method with CP/MISF; it allows us to solve very large scale problems with a few hundred tasks. Numerical examples are included to demonstrate the effectiveness of the proposed algorithms.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.